Send Message
Contact Us

Contact Person : Dina Huang

Phone Number : 18761502682

WhatsApp : +8618761502682

Free call

IoT 1 Phase Wireless Smart Energy Meter with LCD

Minimum Order Quantity : 1 Delivery Time : 5-8 work days
Payment Terms : T/T
Place of Origin: CHINA Brand Name: Acrel
Certification: CE Model Number: ADW310

Detail Information

Reference Voltage: 220~264Vac L-N Phase: Single Phase Energy Meter
Single Gross Weight: 0.500 Kg Operational Temperture: -20℃~+60℃;
Lisplay: LCD Measurement Type: Electricity
Communication Interface: 470MHzInfrared Communication Model: ADW310
Outline: 72*71.5*92.6 Reactive Energy: Class 2
Communication: RS485、Modbus-RTU;Baud Rate 1200~38400 Rated Current: 20(100)A AC (via Paired CT)
Type: Smart Meter Optional Communication: 4G NB-IoT LoRa RS485
Pulse Output: Contant:6400imp/kWh
Highlight:

LCD Wireless Smart Energy Meter

,

1 Phase Wireless Smart Energy Meter

,

IoT Wireless Smart Energy Meter

Product Description

ADW310 IoT 1-phase Wireless Smart Energy Meter

 

Wireless Comms.: 4G, WiFi (MQTT, MODBUS-TCP)
Wired Comms.: RS485 (MODBUS-RTU)
Rated Voltage: 220~264Vac L-N
Rated Current: 20(100)A AC (via paired CT)
Measurement: 1-phase Active&Reactive Energy, Active&Reactive Power, Current, Voltage, Frequncy, Power Factor, Apparent Power
I/O Function: 1-way DI & 1-way DO
Temperature: 2-way Cable Temperature Measurement
Pulse Output: Active Pulse Output
 
Diagram of ADW310 IoT 1-phase Wireless Smart Energy Meter
 
IoT 1 Phase Wireless Smart Energy Meter with LCD 0 IoT 1 Phase Wireless Smart Energy Meter with LCD 1

 

Common FAQ

IoT 1 Phase Wireless Smart Energy Meter with LCD 2

Q:What's the biggest advantage of ADW310?

A:ADW300 has its built-in wireless communication module which allow it to realize 4G LTE, WiFi upstream communication without using extra IoT gateways. For the application scenarios when the meters can't be of centralized installation, ADW310 will usually be the best option for monitor 3-phase circuits that were far from each other.

 

Q:How should I deal with RS485 network communication malfunction?

A:First, check if the wiring of RS485 communication line was loosen or wired incorrectly.(like reversely wiring the A,B terminal).

Next,inspect if the meter’s setting of address, baud rate, check bit was correct by using keypads on the meter.

 

Q:Which part of wiring was necessary for ADW310 to gain some basic electricity parameters monitoring?

A:Normally, only current input wiring via CT and voltage input wiring via direction connection was necessary for ADW310 to realize basic metering function.

 

Q:What's the power supply for ADW310 Series

A:Voltage input of ADW310 also serve as the power supply of ADW310 Seires. Be aware the rated/max voltage input range must be within the range of 85~265Vac L-N.

 

Other Question? Please contact us and we will get back to you as soon as possible.
 

You Might Be Into These
Get in touch with us

Enter Your Message

aump.chang@email.acrel.cn
+8618761502682
18761502682
18761502682
18761502682